Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Erosion Control Inspector Certification, Illustrated: Permits, BMPs and the Site Walk One BMP on Every Page

Silt fence, inlet protection, construction entrances, check dams, sediment traps, stockpiles, SWPPP basics, inspection frequency and corrective actions. Built on the EPA 2022 CGP, with every spot flagged where your state's permit can differ. One topic per page: the drawing first, then what you need to remember. 64 illustrated pages.

SEE EVERY BMP DRAWN

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach BMP drawn right and wrong, with the explanation beside it
64 illustrated pages8 parts, from how soil leaves a site to exam day
Up-to-date sourcesEPA 2022 CGP, Clean Water Act and 40 CFR 450
PDF by emailFormat

Look Inside the Book

Every page has one big drawing and a box with the numbers and inspection steps you need to know:

Cover first, trap second: the blanket on the slope, the silt fence at its toe.
Cover first, trap second: the blanket on the slope, the silt fence at its toe.
Clean Water Act → NPDES → EPA CGP or your state's permit, drawn as one family tree
Clean Water Act → NPDES → EPA CGP or your state's permit, drawn as one family tree
Same lot, cleared all at once vs. in 3 phases: minimize exposed soil (40 CFR 450.21)
Same lot, cleared all at once vs. in 3 phases: minimize exposed soil (40 CFR 450.21)
Downslope edges only, installed before upslope grading, cleaned at 1/2 height
Downslope edges only, installed before upslope grading, cleaned at 1/2 height
Stockpiles under the EPA CGP: idle 14+ days = cover or stabilize, controls on every downgradient side.
Stockpiles under the EPA CGP: idle 14+ days = cover or stabilize, controls on every downgradient side.
EPA CGP: every 7 days, or every 14 days + within 24 h of a 0.25-in storm
EPA CGP: every 7 days, or every 14 days + within 24 h of a 0.25-in storm
EPA CGP inspection report: date, names and titles, findings, rain data, signed per Appendix I, done within 24 hours.
EPA CGP inspection report: date, names and titles, findings, rain data, signed per Appendix I, done within 24 hours.
1 acre, 14 days, 0.25 inch, 24 hours, 70%, 50 ft, 3 years: all EPA CGP numbers, drawn
1 acre, 14 days, 0.25 inch, 24 hours, 70%, 50 ft, 3 years: all EPA CGP numbers, drawn

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 8 parts and 60 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're standing on a bare 6-acre lot the morning grading starts, and the GC wants to clear the whole thing in one pass. You know the permit says something about that, but it won't come to you.

Your manual covers phasing in three dense paragraphs: minimize disturbance, sequence the work, stabilize promptly. Words with no picture of the lot just don't stick.

Same lot, cleared all at once vs. in 3 phases: minimize exposed soil (40 CFR 450.21)

In the book, phasing is one page: the same lot drawn twice, cleared all at once vs. in 3 phases, with the exposed soil shaded and 40 CFR 450.21 in a box right beside it.

Silt fence, stockpiles, inspection frequency, the inspection report and the permit family tree each get their own page, drawn the same way.

You get it, and you lay out the phases on site without going back to the manual.

COMPARE FOR YOURSELF

Same Topic, Two Ways to Study It

THIS
  • The manual: line after line of text
  • Permits and BMPs explained only in words
  • Phasing: three dense paragraphs, no picture of the lot
Section 402 of the Clean Water Act establishes the National Pollutant Discharge Elimination System (NPDES), under which point source discharges of pollutants to waters of the United States are prohibited unless authorized by a permit. Stormwater discharges associated with construction activity disturbing one or more acres, including smaller sites that are part of a larger common plan of development or sale, require coverage. Where EPA is the permitting authority, coverage is obtained under the Construction General Permit; in authorized states, the state-issued general permit applies instead, subject to its own conditions.
FOR THIS
  • The permit family tree in one drawing
  • The numbers in a box
  • The same lot drawn twice: one pass vs. 3 phases
Clean Water Act → NPDES → EPA CGP or your state's permit, drawn as one family tree
CONTENTS

Take a Look at the 8 Parts and 60 Topics

How soil leaves a site, permits and the SWPPP, erosion control, sediment control, housekeeping, the 5-step inspection, reports and closeout, and a final review: 64 pages, all illustrated.

IHow Soil Leaves a Site · pp. 5-10
  1. Erosion Control vs. Sediment Control
  2. The Five Stages of Water Erosion
  3. Sand, Silt, Clay: Which Soil Moves Most
  4. Slope Length and Steepness
  5. What Makes Erosion Worse: the RUSLE Factors
  6. Turbidity and Why Muddy Water Is a Violation
IIPermits and the SWPPP · pp. 11-18
  1. Clean Water Act, NPDES and the CGP
  2. Who Needs Coverage: the 1-Acre Rule
  3. Operators: Who Signs What
  4. NOI, Waiting Period, NOT
  5. What a SWPPP Must Contain
  6. Reading the Site Map in 60 Seconds
  7. Keeping the SWPPP Current
  8. The Qualified Person
IIIErosion Control: Cover the Soil · pp. 19-26
  1. Phasing and Minimizing Disturbance
  2. Stabilization Deadlines
  3. Surface Roughening and Tracking
  4. Temporary and Permanent Seeding
  5. Mulch: Straw, Wood and Hydromulch
  6. Erosion Control Blankets: Installed Right
  7. Erosion Control Blankets: Common Failures
  8. Diversions, Slope Drains and Outlet Protection
IVSediment Control: Catch the Soil · pp. 27-36
  1. Perimeter Controls: Where They Go
  2. Silt Fence: Correct Installation
  3. Silt Fence: The Wrong Ways
  4. Fiber Rolls and Compost Socks
  5. Check Dams and Their Spacing
  6. Inlet Protection: Drop Inlets
  7. Inlet Protection: Curb Inlets
  8. Stabilized Construction Entrance
  9. Sediment Traps
  10. Sediment Basins
VPollution Prevention and Housekeeping · pp. 37-42
  1. Stockpiles
  2. Concrete Washout
  3. Fueling, Spills and Equipment
  4. Waste, Sanitary and Materials Storage
  5. Dewatering Discharges
  6. Natural Buffers and Sensitive Waters
VIThe Inspection: Same 5 Steps Every Time · pp. 43-51
  1. How Often You Inspect
  2. Rain Gauge and Reduced Frequency
  3. Before You Walk: Prep in 5 Minutes
  4. Step 1: Walk the Perimeter
  5. Step 2: Entrances and Track-Out
  6. Step 3: Inlets and Discharge Points
  7. Step 4: Slopes, Channels and Stabilized Areas
  8. Step 5: Washout, Stockpiles and Housekeeping
  9. After a Storm: What Changes
VIIReports, Corrective Actions, Closeout · pp. 52-58
  1. What the Inspection Report Must Include
  2. Writing a Finding the Right Way
  3. What Triggers a Corrective Action
  4. Corrective Action Deadlines
  5. When the State Inspector Shows Up
  6. Record Keeping
  7. Final Stabilization and the NOT
VIIIReview for the Exam and the Site Walk · pp. 59-64
  1. The Numbers to Know, on One Page
  2. Look-Alikes That Get Mixed Up
  3. Which BMP Goes Where
  4. Where Your State May Differ
  5. The 5-Step Walk on One Page
  6. Exam Day: How to Read the Questions

One Page, One Topic, All Clear

Think of it this way:

It rained overnight. Your gauge reads 0.3 inches, and before the crew shows up you have to decide whether today is an inspection day.

You open the book to the page on inspection frequency and see the two schedules drawn side by side: every 7 days, or every 14 days plus within 24 hours of a 0.25-inch storm.

Stockpiles under the EPA CGP: idle 14+ days = cover or stabilize, controls on every downgradient side.

Same with silt fence, inlet protection, the construction entrance, stockpiles and the inspection report: each one on its own page, drawn.

Erosion Control Inspector Illustrated is 8 parts and 60 topics, all drawn, and at the end a review section with the numbers to know and the 5-step walk on one page.

What you see drawn, you don't have to memorize.

What's Inside Erosion Control Inspector Illustrated:

Ipp. 5-10

How Soil Leaves a Site

Erosion vs. sediment control, the five stages of water erosion, sand, silt and clay, slope length and steepness, the RUSLE factors and turbidity.

IIpp. 11-18

Permits and the SWPPP

Clean Water Act, NPDES and the CGP, the 1-acre rule, operators, NOI and NOT, what a SWPPP must contain, the site map and the qualified person.

IIIpp. 19-26

Erosion Control: Cover the Soil

Phasing, stabilization deadlines, surface roughening, seeding, mulch, erosion control blankets right and wrong, diversions, slope drains and outlet protection.

IVpp. 27-36

Sediment Control: Catch the Soil

Perimeter controls, silt fence right and wrong, fiber rolls, check dam spacing, drop and curb inlet protection, construction entrances, sediment traps and basins.

Vpp. 37-42

Pollution Prevention and Housekeeping

Stockpiles, concrete washout, fueling and spills, waste and materials storage, dewatering and natural buffers.

VIpp. 43-51

The Inspection: Same 5 Steps Every Time

How often you inspect, rain gauges and reduced frequency, 5-minute prep, the 5 walking steps and what changes after a storm.

VIIpp. 52-58

Reports, Corrective Actions, Closeout

What the report must include, writing a finding, corrective action triggers and deadlines, the state inspector's visit, record keeping and final stabilization.

VIIIpp. 59-64

Review for the Exam and the Site Walk

The numbers to know on one page, look-alikes that get mixed up, which BMP goes where, where your state may differ, the 5-step walk and exam-day reading.

At the end of the book: A review section with the numbers to know, look-alike BMPs and the 5-step walk on one page.

Plus: 2 Free Books

Erosion & Sediment Control Exam-Style Workbook

BONUS 1: «Erosion & Sediment Control Exam-Style Workbook»

Value on its own: US$ 17.90

Practice with exam-style questions and site scenarios, each answer explained with a drawing, so you find your weak spots before exam day.

15 Common Site Mistakes, Before & After

BONUS 2: «15 Common Site Mistakes, Before & After»

Value on its own: US$ 14.90

The silt fence, inlet protection and construction entrance mistakes inspectors flag most often, each drawn wrong and then fixed, for a quick review before any site walk.

Erosion Control Inspector Illustrated with 2 Free Books

  • Erosion Control Inspector Illustrated: 64 illustrated pagesUS$ 63
  • BONUS 1: Erosion & Sediment Control Exam-Style WorkbookUS$ 17.90
  • BONUS 2: 15 Common Site Mistakes, Before & AfterUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT EROSION CONTROL INSPECTOR ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Erosion Control Inspector Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're studying for the certification

You're studying for the certification

Every BMP is a drawing with its numbers written on it, so the manual's chapters finally line up in your head.

Your exam is coming up

Your exam is coming up

The review part puts the numbers, the look-alikes and the 5-step walk on single pages you can go over the night before.

You already sign inspections

You already sign inspections

Print it and keep it in the truck: before a site walk or a state visit, you check the page and know what to look for.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT EROSION CONTROL INSPECTOR ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Erosion Control Inspector Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I've worked on construction sites for years?

Yes. It doesn't teach you how to run a site. Each page goes straight to the permit rule, the number and the inspection step you need for the certification and for signing reports. The basics are there, one page each, so you can skip what you already know.

Does it work for my state's certification?

It covers what every state program builds on: the EPA 2022 Construction General Permit (the version in force), the Clean Water Act and 40 CFR 450. Most states issue their own permit, and some numbers can change, like the rain trigger or the deadlines. The book flags those spots so you check them in your state's permit and manual.

Is it official material?

No. It's an independent study guide, not issued or endorsed by the EPA, any state agency or any certification program. It doesn't give you a certificate or count as training hours: your certification comes from your state's or program's course and exam.

Does it replace the certification course?

No. If your state or program requires a course, you still take it. The book helps you study for it and keep everything at hand afterward.

Are the practice questions the ones on the exam?

No. The workbook questions are written for this book. They're exam-style, not official questions from any exam.

When and how do I get it?

PDF by email, sent to the address you enter at checkout. The 2 bonus books come with it.

Do I have to pay every month?

No. It's a one-time payment.

Can I have it on paper?

Yes. It's a printable PDF: print the whole book or just the pages you want to keep in the truck.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading the manual with nothing sticking.

Silt fence, inlets and entrances: you see them drawn, and they stick.

You get to the exam, or the site walk, knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT EROSION CONTROL INSPECTOR ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.